On this new hangar project for the U.S. Air Force our subcontract included installation of interior and exterior metal stud framing, gypsum board, acoustical and thermal insulation, exterior insulated metal wall and roof panels, spray applied fireproofing, and acoustical ceilings. On this project we overcame some challenging weather conditions due to the size of the structure and the prevailing winds in the area.